|
文件名 |
文件标题 |
工作组 |
项目组 |
时间 |
会员 |
|
issenhuth_PMD_01_211210.pdf |
Joint Working Groups Meeting, December 10, 2021 |
|
|
2022-02-15 |
y84253210 |
|
Geng_PMD_01_211210.pptx |
WG Email Subscription Guideline |
|
|
2022-02-15 |
y84253210 |
|
Chen_FF_01_211210.pdf |
50G SFP electrical Interface |
|
|
2022-02-15 |
y84253210 |
|
PMD-Unapproved-Meeting-Minutes-211119.pdf |
Unapproved Meeting Minutes November 19th, 2021 |
|
|
2022-02-15 |
y84253210 |
|
Chang_PMD_01_211210.pdf |
Feasibility of 800G LR4 with PAM4 IMDD |
|
|
2022-02-15 |
y84253210 |
|
Yao_AR_01_211210.pdf |
Analysis on Output Optical power and Power Consumption of ELS for 6.4T Optical Engine |
|
|
2022-02-15 |
y84253210 |
|
IPEC-PMD_800G_comments.xlsx |
PMD 800G Comment File |
|
|
2022-02-15 |
y84253210 |
|
Wu_AR_01_211210.pdf |
224G CPO’s scheme and how to face the “challenge” of FPP |
|
|
2022-02-15 |
y84253210 |
|
Xie_PLUG_01a_211210.pdf |
Test Specification for 100Gb/s and 400Gb/s PAM4 Optical Module at 100 Gb/s Per Lane |
|
|
2022-02-15 |
y84253210 |
|
Issenhuth_PMD_01a_211210.pdf |
Joint Working Groups Meeting December 10, 2021 – Updated |
|
|
2022-02-15 |
y84253210 |
|
PMD-Approved-Meeting-Minutes-211119.pdf |
Approved Meeting Minutes November 19th, 2021 |
|
|
2022-02-15 |
y84253210 |
|
Yao_AR_01_211210.pdf |
Analysis on Output Optical power and Power Consumption of ELS for 6.4T Optical Engine |
|
|
2022-02-15 |
y84253210 |
|
Chen_FF_01_220114.pdf |
DSFP56 a new 50G Optical Module Solution |
|
|
2022-02-15 |
y84253210 |
|
Yun_PMD_01_211210.pdf |
800 Gb/s PHY Implementation Agreement D0.4 |
|
|
2022-02-15 |
y84253210 |
|
PMD-Unapproved-Meeting-Minutes-211210.pdf |
Unapproved Meeting Minutes December 10th, 2021 |
|
|
2022-02-15 |
y84253210 |
|
Zhang_FF_01_220114.pdf |
Electrical parameter the SFP56 slow down to 25GBPS |
|
|
2022-02-15 |
y84253210 |
|
Pan_FF_01_220114.pdf |
Rate Switching Delay of 50G PAM4 DSP |
|
|
2022-02-15 |
y84253210 |
|
bernier_AR_01_220114.pdf |
Summary of Co-Packaging Framework document at Optical Internetworking Forum |
|
|
2022-02-15 |
y84253210 |
|
issenhuth_PMD_01_220114.pdf |
Joint Working Groups Meeting January 14, 2022 |
|
|
2022-02-14 |
y84253210 |
|
Zhang_FF_02_220114.pdf |
Calibration and Acceptance Solution of Swing/cursor on TP4 |
|
|
2022-02-14 |
y84253210 |