-
文件名 文件标题 工作组 项目组 时间 会员 issenhuth_PMD_01_211210.pdf Joint Working Groups Meeting, December 10, 2021 2022-02-15 y84253210 Geng_PMD_01_211210.pptx WG Email Subscription Guideline 2022-02-15 y84253210 Chen_FF_01_211210.pdf 50G SFP electrical Interface 2022-02-15 y84253210 PMD-Unapproved-Meeting-Minutes-211119.pdf Unapproved Meeting Minutes November 19th, 2021 2022-02-15 y84253210 Chang_PMD_01_211210.pdf Feasibility of 800G LR4 with PAM4 IMDD 2022-02-15 y84253210 Yao_AR_01_211210.pdf Analysis on Output Optical power and Power Consumption of ELS for 6.4T Optical Engine 2022-02-15 y84253210 IPEC-PMD_800G_comments.xlsx PMD 800G Comment File 2022-02-15 y84253210 Wu_AR_01_211210.pdf 224G CPO’s scheme and how to face the “challenge” of FPP 2022-02-15 y84253210 Xie_PLUG_01a_211210.pdf Test Specification for 100Gb/s and 400Gb/s PAM4 Optical Module at 100 Gb/s Per Lane 2022-02-15 y84253210 Issenhuth_PMD_01a_211210.pdf Joint Working Groups Meeting December 10, 2021 – Updated 2022-02-15 y84253210 PMD-Approved-Meeting-Minutes-211119.pdf Approved Meeting Minutes November 19th, 2021 2022-02-15 y84253210 Yao_AR_01_211210.pdf Analysis on Output Optical power and Power Consumption of ELS for 6.4T Optical Engine 2022-02-15 y84253210 Chen_FF_01_220114.pdf DSFP56 a new 50G Optical Module Solution 2022-02-15 y84253210 Yun_PMD_01_211210.pdf 800 Gb/s PHY Implementation Agreement D0.4 2022-02-15 y84253210 PMD-Unapproved-Meeting-Minutes-211210.pdf Unapproved Meeting Minutes December 10th, 2021 2022-02-15 y84253210 Zhang_FF_01_220114.pdf Electrical parameter the SFP56 slow down to 25GBPS 2022-02-15 y84253210 Pan_FF_01_220114.pdf Rate Switching Delay of 50G PAM4 DSP 2022-02-15 y84253210 bernier_AR_01_220114.pdf Summary of Co-Packaging Framework document at Optical Internetworking Forum 2022-02-15 y84253210 issenhuth_PMD_01_220114.pdf Joint Working Groups Meeting January 14, 2022 2022-02-14 y84253210 Zhang_FF_02_220114.pdf Calibration and Acceptance Solution of Swing/cursor on TP4 2022-02-14 y84253210

